2006-02-22, 10:59 PM
sub with the resume point cut off in the config.xml file, i set to like 2mins at start and 5 mins at end. but if a when a video is stopped in these "ignore" gaps the old resume point isnt delete from the resume point table. so if there was a resume point at 10 minutes, and i stopped it at 2 mins from the end, the next time i start the video it resumes at 10 mins, instead of resuming from no where.